久久人人97超碰婷婷开心情五月,国产91www,91高清在线免费观看,国产91在线播放精品,国产99一区,爱情岛论坛在线视频,国产区福利

Home About us News center Products Innovation Careers
industry news
company news
industry news
media focus
video
Wittmann plans to build Ecopower in Hungary and China
 
 

By Bill Bregar
SENIOR STAFF REPORTER
Published: June 13, 2014 2:33 pm ET
Updated: June 13, 2014 2:43 pm ET


Image By: Wittmann Battenfeld


TORRINGTON, CONN. — Wittmann Battenfeld GmbH plans to begin full production of all-electric EcoPower injection presses at its plant in Hungary by the end of this year — and at the plant in Kunshan, China by Jan. 1, 2016, according to Michael Wittmann.

To accommodate the EcoPower production, the company is expanding its plant in Hungary, located about an hour from the Wittmann Battenfeld’s headquarters plant in Kottingbrunn, Austria. The Kottingbrunn plant is running out of space, after Wittmann Battenfeld last year launched a major expansion for large-tonnage presses. The plant is in a residential area.

Michael Wittmann, general manager of the Wittmann Group, discussed the company’s plants for all-electric machine production during an interview June 5 at an open house in Torrington, Conn. — where its U.S. unit was showing off its own expansion.

“We are installing the EcoPower production in our facility in Hungary, right now,” he said. “Our plan at the moment is to make the 55-ton, 110-ton and 180-ton EcoPowers there.”

The Hungary plant does sheet metal fabrication, control cabinets and machine bases for the EcoPower and other injection presses, and produces robots and temperature controllers. Trial production of EcoPower machines is happening there now. Once full-scale serial production begins in Hungary, Wittmann Battenfeld then will ramp up EcoPower production in China, Michael Wittmann said.

The company plans to assemble EcoPowers in China with clamping forces of 110 and 180 tons, the two most popular sizes there. Customers in China want to buy machines made there. “You cannot import. This is impossible,” Wittmann said.

He said that Wittmann Battenfeld will continue making the larger EcoPower presses in Kottingbrunn, with clamping forces of 240 and 300 tons.

 
About us
company profile
company culture
version and strategy
company history
certification
patents
contact
News center
company news
industry news
media focus
video
Products
products catalog
technical support
Innovation
create value
production line
QA&QC
new technique info
Copyright:King-Tech China Co.,Ltd
简阳市| 伊春市| 泾源县| 新河县| 苍梧县| 绥宁县| 庆元县| 油尖旺区| 介休市| 青河县| 中阳县| 金沙县| 吉木萨尔县| 祁阳县| 玉林市| 兴义市| 岳阳县| 大安市| 内黄县| 松阳县| 马龙县| 乳山市| 武安市| 两当县| 宁明县| 林口县| 榆树市| 冕宁县| 八宿县| 库尔勒市| 巴青县| 永宁县| 尖扎县| 正安县| 台东市| 久治县| 皮山县| 青冈县| 金门县| 礼泉县| 吐鲁番市|